Get a Quote

Industrial Manufacturing

Production Managers

Heavy build up debris in process drain lines will not allow vertical assets in that portion of the plant to operate as engineered. If a pipe was originally designed for a 24″ diameter capacity and the line has not been cleaned and video verified it may only have the capacity of a 12″ line in specific locations or the entire length of the line. The amount of process water and air has been reduced by over 65% not allowing your vertical equipment to cool and expel gases and debris away from the equipment significantly reducing production.

Maintenance Managers

Identify locations where vertical assets routinely need unexplained removal and replacement of parts requiring emergency replacement. Identify locations where outages are required more frequently than in house and consulting engineers designs reflect. If equipment is designed for 365 days and issues historically begin to occur in 180 days.

Environmental

All work performed by Innovative Pipeline Systems is confidential and non-disclosure agreement will be executed. Any location where recurring EPA fines or violations occur. All video inspections will be recorded and a report can be provided to the environmental department for use demonstrating your firms commitment to the environment.

Utility Managers

All work performed by Innovative Pipeline Systems is confidential and non-disclosure agreement will be executed. Any location where recurring EPA fines or violations occur. All video inspections will be recorded and a report can be provided to the environmental department for use demonstrating your firms commitment to the environment.
WE ARE OPEN MONDAY-FRIDAY

7:00 am - 5:00 pm

Have A Question?

224 436 3618

Need A Repair? Our Address

Merrillville, Chicago